All the members participated for the project work except for Gayan Kumara. He informed me about his absence.

Oshadi P.A.U., Padmasiri A.D.R. submitted the final class diagram and the corrected activity diagrams.

Hettiarachchi P.S. and Maliga V.V.N. started to complete the forms which Hettiarachchi P.S. has designed. Ariyadasa H.M.L.L. showed me the home page which he has designed. But i did not accepted it because it did not have an attractive looking. So, he started designing a new home page under my instructions. But he left the place before he finish designing it and the login page.

So we were unable to add the home page and the login screen due to his delay. Hettiarachchi P.S. was able to submit the user forms only. So, I had to submit SRS without the Home page and login screen.

Ileperuma H.A. submitted the description which he wrote under the topic, Project documentation. I checked it and added to the SRS.

I finalised the SRS as soon as I can, and brought it to the Supervisor Mr. Azmeer. He checked it and pointed following mistakes and also he asked to update some descriptions with the following.

Updates
1. Asked us to add XML/CVS reports which can export reports to Micropsoft Excel sheets, under software interfaces.

2. Edit the hardware requirements as the minimum hardware requirments for the system.


Mistakes
1. Numbering mistake

2. A mistake of an Use case scenario pre-condition

3. A mistake in Security Requirments.

4. A mistake in software quality requirements

5. A mistake in topic description of Portability.

The following members participated for the meeting.

  • Katangodage B.T.(I)
  • Ileperuma H.A.
  • Muthugala M.K.N.D.
  • Padmasiri A.D.R.
  • Dilshan M.P.K.
  • Oshadi P.A.U.
  • Hettiarachchi P.S.
  • Maliga V.V.N.


I asked about the marks of our Project Proposal from the supervisor. He told that we had got 70% for the project proposal.

It seems we have to work hard to get good marks for the rest of the work. After that we came back and I edited the mistakes and also i upated the relevant topics with the information our supervisor provided.

  • Katangodage B.T. (I)
  • Dilshan M.P.K.
  • Maliga V.V.N.
  • Ileperuma H.A.

went to show the edited the SRS and get signed it from the supervisor. But he refused to sign because our delay of working. But after we four requested to sign it by forgiving us, he agreed to check n sign.

So, he signed it and we took printouts as soon as we signed it. Also the supervisor asked me to e-mail the SRS to him at night. After that we (Katangodage B.T., Dilshan M.P.K. and Maliga V.V.N. got printouts and submitted both the printouts to the 8th floor of Malabe Campus.

I was so angry with the Interface design team because, they could have created. Though one and half months passed, the interface design team failed to submit any interface design which suits our project topic.